Prime Polymers travels from coast to coast. We are a National “turnkey” installer.
Could I buy the material from you?
No, our material requires training and it is not designed for DIY.
Would you do my residential garage or basement floor?
No, our material is designed for industrial applications.
Do you work weekends or holidays?
We work when it is convenient for our customers. Weekends and holidays are just part of our normal daily business. We do not charge extra for weekend work.
When would the floor be ready for full use?
Depending on the temperature of the facility it is normally 24 hours.
What are your requirements prior to arrival?
We require a sufficient power source, heat, lighting, forklift for use, and a dumpster for non-hazardous waste. We would also need a staging area that is not part of the installed system for mixing and setup.
Will it be very dusty during the installation?
Our equipment will contain most of the dust. Although we take precautions when possible, it is not totally dust free. We take every precaution to keep dust to a minimum.
How much does it cost?
Depending upon the square footage and overall condition of the floor, each job is priced according to the system required. There are many factors that determine the overall price.
How long does a typical installation take?
On average it should take about 3 days for a typical coating system and 4 days for a mortar system. Based on 10,000 sf. or less.
Will the floor be slippery?
Each customer can select their own degree of non-slip, depending upon the conditions of their facility.
What is the normal preparation process of a floor coating?
A typical situation would be to: Shot blast or diamond grind the floor, prime with pigmented primer, apply basecoat/mid coat of epoxy, and top-coat witha urethane.
Who warrants the floor?
We offer a single source warranty – Prime Polymers Inc.